Massachusetts Water Resources Authority Tower Structure Inspection

MA Water Resource Authority

This project included two tower technicians to visually inspect the entire tower structures at the Chelsea Creek Headworks and the Middlesex Fells Reservation for damage: loose bolts, deteriorating galvanized coatings, loose antenna mounting hardware, loose or damaged cable restraints, and overall general conditions including all antennas and existing cabling. Any minor deficiencies (loose bolts, touch up galvanizing) were noted and corrected. The deliverable for this work included providing a written inspection report, photographs, and any obvious concerns.

Client

Massachusetts Water Resources Authority

Location

Chelsea Creek Headworks and Middlesex Fells Reservation, MA

Status

Completed 2022