New Hampshire Department of Transportation
This project consisted of network design, configuration and/or installation for a new bridge surveillance system and assisting NHDoT IT personnel with network and software integration. The system consisted of 14 CCTV cameras on the Sarah Mildred Long Bridge, configuration, and installation of a microwave radio link to the I-95 High Level Bridge, cabinets and racks, cabling plant, copper terminations and testing, fiber optic cabling, installation of ethernet switches, software, uninterruptible power supply (UPS), testing, and training.
Client
Cianbro
Location
New Hampshire
Status
Completed 2019